Garden Sums

Shed base calculator

Measurements in
Shed size

Nominal sizes. Check the floor size in your shed’s instructions, which can differ by a few centimetres.

Wickes suggests a base the same size as the shed or slightly larger.

Type of base
Type of base
Concrete

Depths and sizes for drives, bases and posts are a guide only. Check loads, falls and drainage with your supplier or a professional before you start.

Depths

Extras

We suggest 10% extra.

Result

You'll need about

7 bags of cement

for a 2.44 m × 1.83 m base (4.46 m²)

Base size
2.44 m × 1.83 m
Base area
4.46 m²
Concrete
100 mm

all-in ballast: 0.83 t (1 × 850 kg bulk bag)

MOT type 1 sub-base: 0.77 t (1 × 850 kg bulk bag)

Shopping list

  • 725 kg bags of cement172 kg needed
  • 1bulk bag of all-in ballast (approx. 850 kg each)0.83 t needed
  • 1bulk bag of MOT type 1 sub-base (approx. 850 kg each)0.77 t needed

Use this shed base calculator to work out the materials for a concrete or paving slab base under a garden shed, from a standard size in feet or your own measurements. It gives the cement and ballast or ready-to-use bags, or the slabs and mortar, plus the type 1 sub-base underneath.

A sandstone patio beside a brick house, with pots of plants and a wooden table and chairs.

How to size a shed base

Start with the shed’s floor, not its roof. UK sheds are sold in feet, such as 8 × 6 or 10 × 8, and those sizes are nominal: the real floor can differ by a few centimetres, and the roof overhangs the walls. Check the floor size in your shed’s instructions, then pick the nearest standard size, or choose Another size and type in the floor length and width.

Wickes suggests a base the same size as the shed or slightly larger. Extra all round adds the same margin to every side, so 50 mm all round makes the base 100 mm longer and 100 mm wider than the floor. The calculator starts with no margin, a base the same size as the shed.

Lengths can be typed in metres or in feet and inches; switch at the top of the calculator. Depths are always in millimetres.

Shed base size calculator: from feet to metres

Standard sizes are converted at 0.3048 m to the foot, so an 8 × 6 ft shed needs a base of 2.44 m × 1.83 m, a little under 4.5 m², before any margin. The result shows the base size in metres at the top, which is what you mark out on the ground with pegs and string.

Used as a shed base size calculator, the margin box does the rest: add the margin you want and the base size, the area and every material update together. If your shed maker gives base dimensions of its own, use those with Another size rather than the nominal floor size.

Concrete for a shed base

The concrete volume is the base area × the slab thickness, plus 10%, the allowance B&Q adds to concrete. Then there are two ways to buy it, and the Concrete choice in step 2 switches between them.

Mixing it yourself: cement and ballast

B&Q mixes shed base concrete at one part cement to 4 parts ballast. Its table shows that a cubic metre of concrete takes a full cubic metre of all-in ballast plus the cement: once water goes in, the cement fills the gaps between the stones. So the dry materials come to 1.25 times the finished volume. The calculator uses that factor, splits the dry volume at the mix ratio and weighs each part: ballast at a typical 1.5–1.8 t/m³, cement at a density worked out from B&Q’s concrete table.

For ballast on its own, for a path edge or a footing, use the aggregate calculator.

Ready-to-use bags of concrete

Bags of ready-mixed concrete only need water, which is handy for a small base. Each 20 kg bag makes only about 0.01–0.0125 m³ of concrete, according to Tarmac and Carlton, and the calculator uses the lower figure. Even a small shed base takes a lot of bags, so compare the two options before you decide.

Paving slab shed bases

A slab base is laid like a small patio: slabs on a full bed of sharp sand and cement over the type 1. The calculator offers 600 mm and 450 mm square slabs, counts them without joints and adds the allowance for cuts. If the base is not a whole number of slabs, the last row is cut.

The mortar bed is worked out like a patio bed, at 3–4 parts sand to one of cement. For a patio or path next to the shed, the patio calculator adds joints and jointing compound as well.

What this calculator leaves out

There is no damp-proof membrane in the list. We have not found a UK guide that gives a quantity for one under a shed base, so follow your shed maker’s instructions. Plastic grid bases are not covered either. The list also leaves out the timber for the formwork round a concrete base, and the pegs and string for setting out.

Worked example: a concrete base for a 10 × 8 shed

Here is the full calculation for a 10 × 8 ft shed on a concrete base mixed from cement and ballast, with no extra margin, the starting depths and the standard extra allowance. Every line comes from the same code that runs the calculator above.

  1. Shed 10 × 8 ft: 3.05 m × 2.44 m = 7.43 m²
  2. Base (3.05 m + 2 × 0 mm) × (2.44 m + 2 × 0 mm) = 3.05 m × 2.44 m = 7.43 m²
  3. Concrete 7.43 m² × 0.1 m + 10% = 0.818 m³
  4. Dry materials 0.818 m³ of concrete × 1.25 = 1.02 m³
  5. Cement (1 part in 5) 1.02 m³ ÷ 5 × 1.4 t/m³ = 286 kg → 12 25 kg bags
  6. All-in ballast (4 parts in 5) 1.02 m³ × 4 ÷ 5 × 1.7 t/m³ = 1.39 t
  7. Sub-base: MOT type 1 sub-base 7.43 m² × 0.075 m × 2.1 t/m³ + 10% = 1.29 t

On the list:

  • 1225 kg bags of cement286 kg needed
  • 2bulk bags of all-in ballast (approx. 850 kg each)1.39 t needed
  • 2bulk bags of MOT type 1 sub-base (approx. 850 kg each)1.29 t needed

Notice that the ballast and the sub-base are both bulk-bag jobs, while the cement is counted in bags: the mix puts several times as much ballast as cement into the concrete. Switch to Ready-to-use bags to compare: the same volume of concrete takes far more bags.

UK cement, ballast and concrete sizes

Cement comes in 25 kg bags and ready-to-use concrete in 20 kg bags. All-in ballast, sharp sand and MOT type 1 come in bulk bags of around 850 kg or 800 kg, depending on the merchant, and ballast and sand in small bags too.

Common UK sale sizes for shed base materials
ProductSizeGood for
Cement, 25 kg bag25 kgGeneral purpose cement.
Ready-to-use concrete, 20 kg20 kgJust add water; for small bases.
Bulk bag, 850 kg850 kgThe most common merchant bulk bag. About 10 m² of gravel at 50 mm.
Bulk bag, 800 kg800 kgSold by several DIY chains and merchants; weight can vary by about 5% with moisture.
Small bag, 22.5 kg22.5 kgA common DIY-store “major bag” size.
Small bag, 25 kg25 kgMerchant “handy bag” or trade pack.
600 × 600 mm slabs600 × 600 mmSingle-size paving.
450 × 450 mm slabs450 × 450 mmSingle-size paving.

The list counts bulk bags of 850 kg. If your merchant’s bags are smaller, a large base may need one more: divide the tonnes in the result by their bag size and round up.

Common mistakes with shed bases

  • Sizing the base to the roof. The roof overhangs the walls. Size the base to the floor, plus any margin you want.
  • Trusting the nominal size. An 8 × 6 shed is not always exactly 8 ft by 6 ft. Check the floor size in the instructions.
  • Forgetting the sub-base. Both kinds of base sit on compacted type 1, and it is on the list whichever you pick.
  • Underestimating ready-mixed bags. One bag makes only a small amount of concrete. Check the bag count before you choose them for a big base.
  • Ordering ballast for the concrete volume only. Dry ballast and cement take up more room than the concrete they make. The calculator allows for this using B&Q’s figures.
  • Forgetting the formwork. A concrete base needs timber boards round the edge while it sets, and they are not on the list.

What else you'll need

  • Type 1 for a path to the shed: the type 1 calculator works out the sub-base on its own.
  • Ballast or sharp sand on their own: use the aggregate calculator.
  • A patio beside the shed: the patio calculator does slabs, bed and jointing.
  • Paint or treatment for the shed once it is up: the fence paint calculator covers sheds too.
  • Timber for the formwork, pegs and string to mark out, and a long spirit level to check the base.

Last checked 28 October 2026